History of Chengdong

2017

1) New Factory in Lutai is under construction

2) First exhibition of construction camp has been shown in Chengdong

3) Industry exchange meeting is held in Chengdong

4) First Supplier meeting has beed held.

 

2016

1) New publicity film of "home" announced.

2) Achieved CE certification.

3) Chengdong Camp signed "Purchase Contract of Prefabricated Houses in Nigeria Oil Refinery Project"

4) Chengdong Modular Housing Hebei Co., Ltd. was founded.

 

2015

1) China assistance project of Syrian humanitarian container houses was delivered successfully.

2) Chengdong Home of Staff opened.

3) Chengdong Manager Classroom set up.

4) Beijing Chengdong public welfare foundation established.

5) National Equities Exchange and Quotations of Chengdong Camp listed successfully.

6) Chengdong Camp increased internal shares to employees.

7) Chengdong Camp signed "Purchase Contract of Prefab Building Products for Santa Cruz River Power Station Project"

8) Chengdong Camp was selected as one of the Ten Outstanding Suppliers in China Road and Bridge Corporation.

9) The project of Sunshine Charitable Welfare Program funded by Chengdong Camp completed successfully.

10) Chengdong Camp Iraq project was selected as the benchmark camp project.

 

2014

1) The registration of Beijing Easy Building Co.,Ltd. was approved on May 26.

2) Songzhuang factory was incorporated into technical system, focusing on the production and improvement of the container house.

3) Flex products passed USA certification and put into production.

 

2013

1) Joint venture with world-class modular housing leader-Algeco Scotsman and founded "Algeco chengdong" which operates the business of rental and sale in China market

2) The 1,000 container house came out

 

2012

1) Chairman with board members went to USA, France and Italy to communicate with prefab suppliers

 

2011

1) Successfully passed HSE certification audit

2) Chairman Mr Zhao Junyong was elected as NPC member of Tongzhou District

 

2010

1) Introduced the performance management system

2) Undertook the first EPC project "Nigeria milk products factory project"

 

2009

1) Held the general meeting of shareholders. The number of shareholders was up to 108.

2) Set up Chengdong scholarship fund in Songzhuang middle school and held the ceremony

3) The board of directors called for the concept of second pioneering and determined the overall thought

4) Beijing Chengdong International Modular Housing Co., Ltd was registered (CDPH)

 

2008

1) Achieved ISO9001 and ISO14001 system certificates

2) Opened Communist Party branch of Beijing Chengdong Prefabricated house Co.,ltd

3) Registered Beijing Chengdong Rixin Prefabricated Housing Co.ltd

4) Undertook Wenchuan Earthquake project (disaster relief house, earthquake proof schools, offices)

5) Donated Chengdong Seismic Hope Primary School -- the first Seismic Hope Primary School through China

 

2007

1) Registered Lanzhou Chengdong Prefabricated Housing Co.ltd

2) 《CDPH GUIDE》started publication

3) Restructuring enterprise structure and splitting into international company and North China Company

4) Established production base in Huo County of Tongzhou District(Leased 100 acres of land)

 

2006

1) Registered Tianjin Chengdong Prefabricated Housing Co.ltd

2) Turnover exceeded US$14,000,000

 

2005

1) Registered Wuhan Chengdong Prefabricated Housing Co.ltd

2) Registered Sichuan Chengdong Prefabricated Housing Co.ltd

3) Filmed the first enterprise Promo

4) Investigated Middle East market personally

5) Turnover exceeded US$7,000,000

 

2004

1) Opening external equity and absorption of external shareholders

2) Introduced Enterprise image recognition system (VI system)

3) Joint venture to found the company of Beijing Chengdong Oriental color steel products Co. Ltd.

4) Achieved independent right of import and export

5) Achieved ISO9001:2000 quality system certificate and obtained 3 grade professional contracting qualification for steel structure;

 

2003

1) Company executives and technical officers went to Japan for technology learning.

2) Construction of "SARS" Beijing Chest Hospital. Because of the outstanding performance, the company chairman Mr. Zhao Junyong was awarded as the outstanding communist title during "Beijing city construction system of prevention and treatment of SARS".

3) Moved to Songzhuang of Tongzhou District (factory area expanded to 40 acres)

4) Beijing Chengdong Prefabricated Housing Co.ltd was registered (2nd name of CDPH).

 

2002

1) The second generation 9910A4 house was born and K type house (two floors, three floors) were under research

 

2001

1) Factory moved to Daxing agricultural school (factory area expanded to 12 acres)

 

2000

1) Leased Beijing Ximachang wooden box factory as factory (area was 3 acres)

2) Construction of the first overseas project- Kyrgyzstan army barrack project with client of China geological engineering group

 

1999

1) Undertook the National Day Parade Village project, the first generation of 9910 type house was newly on sale

 

1998

2) Beijing Xingyi Prefabricated house Co.,ltd was founded ( the predecessor of CDPH)